305-256-9793
Installing  new led lighting for show room

Installing new led lighting for show room

Installed new Trlife modern wall lights.

Installed new Trlife modern wall lights.

Replacing 400 watt metal halide lamps and ballast on parking light poles
Ceramic Matrix Tile
Weat Palm Beach Fl

Replacing 400 watt metal halide lamps and ballast on parking light poles Ceramic Matrix Tile Weat Palm Beach Fl

Restored power to the refrigerator by changing it’s breaker and outlet.

Restored power to the refrigerator by changing it’s breaker and outlet.

Installed new safty disconnection on dishwasher

Installed new safty disconnection on dishwasher

Replaced 20amp GFCI receptacle outlet in kitchen.
Homestead Fl 33034

Replaced 20amp GFCI receptacle outlet in kitchen. Homestead Fl 33034

Installed new electrical panel .

Installed new electrical panel .

Troubleshooting BAF fan not working.
Jaguar of Palm Beach 33401

Troubleshooting BAF fan not working. Jaguar of Palm Beach 33401

Installed 3 GFI’s and replaced a fan box.

Installed 3 GFI’s and replaced a fan box.

Installed 4 ceiling fans.

Installed 4 ceiling fans.

Installing new big ass fans

Installing new big ass fans

Installing new big ass fans at medley

Installing new big ass fans at medley

Installed 3 GFCI’s, and restored power to over 6 outlets.

Installed 3 GFCI’s, and restored power to over 6 outlets.

Installed a new wireless door bell, installed a new dimmer switch, and replaced an old power plug.

Installed a new wireless door bell, installed a new dimmer switch, and replaced an old power plug.

Fixed lightbulb socket, and inspected and diagnose multiple electrical issues in the home.

Fixed lightbulb socket, and inspected and diagnose multiple electrical issues in the home.

ESR diagnose 3 ceiling fans.

ESR diagnose 3 ceiling fans.

Installed new electrical panel in Weston fl.

Installed new electrical panel in Weston fl.

Replacing T12 lamps and ballast
YouFit Gym
Miami Fl

Replacing T12 lamps and ballast YouFit Gym Miami Fl

Installing Big Ass Fans.
Gannett's Paper
Stuart Fl

Installing Big Ass Fans. Gannett's Paper Stuart Fl

Repairing exhaust fan installed new belt , motor and pulley

Repairing exhaust fan installed new belt , motor and pulley

ESR electricians were able to fix the problem concerning the electrical for the A/C unit.

ESR electricians were able to fix the problem concerning the electrical for the A/C unit.

Replace VFD on big fan
Daytona Auto Mall
Daytona Fl

Replace VFD on big fan Daytona Auto Mall Daytona Fl

Installing new big ass fans and lights

Installing new big ass fans and lights

ESR electricians diagnose the electrical issue with the A/C unit and are waiting for approval from the insurance to fix it.

ESR electricians diagnose the electrical issue with the A/C unit and are waiting for approval from the insurance to fix it.

ESR was able to diagnose the issue with the treadmill and took care of other needs in this local YouFit.

ESR was able to diagnose the issue with the treadmill and took care of other needs in this local YouFit.

Closed an open 1900 blank box, and diagnose the current issue.

Closed an open 1900 blank box, and diagnose the current issue.

Uninstalled an old ceiling fan and installed a new one.

Uninstalled an old ceiling fan and installed a new one.

Repairing street lighting at marlin park

Repairing street lighting at marlin park

Rewired pool light.

Rewired pool light.

Replaced two circuit breakers: 1 20 AMP and two pole 20 AMP breaker.

Replaced two circuit breakers: 1 20 AMP and two pole 20 AMP breaker.

Changed two panel breakers.

Changed two panel breakers.

Installed 3 chandeliers.

Installed 3 chandeliers.

Installed 3 chandeliers.

Installed 3 chandeliers.

Connected pool pump.

Connected pool pump.

Installed 5 fans.

Installed 5 fans.

Installed new lighting around pool deck

Installed new lighting around pool deck

Installing new led parking lot lighting at old cutler church.

Installing new led parking lot lighting at old cutler church.

Replaced parking 3 light, 3 ballast, and 3 bolts

Replaced parking 3 light, 3 ballast, and 3 bolts

Installing 2 new big ass fans

Installing 2 new big ass fans

Installing new electrical power installation at Miami International Airport

Installing new electrical power installation at Miami International Airport

Photo Gallery powered by BOOM Brink of Online Marketing